
Guadalupe-Lamar urban rail line would serve 31% of all Austin jobs
24 October 2013♦
An urban rail line installed in the Guadalupe-Lamar (G-L) corridor (plus a short extension to the Seaholm area) would provide high-quality, high-capacity transit service to nearly one-third of all Austin jobs, according to a study based on 2011 U.S. Census data by the Central Austin Community Development Corporation (CACDC), led by Scott Morris.
The CACDC’s Austin Urban Rail website presents a map of a possible alignment on Guadalupe-Lamar, including 14 stations with locations optimized by the census employment data. The CACDC study says that that the On The Map online census utility “was used to measure jobs located within one quarter mile and one half mile of each proposed station point.”
According to the U.S. Census Bureau, Center for Economic Studies 2011 Current Employment Statistics, the Guadalupe-North Lamar Sub-Corridor contains the highest density of jobs in the city. … The results speak for themselves. If built, the Guadalupe North Lamar alignment would put tracks within a ten minute walk of over 31% of all jobs in the city.
One can infer that, if the G-L corridor route were combined with the proposed conversion of the eastside Red Line to electric urban rail (light rail transit) as proposed by Texas Association for Public Transportation — a proposal which includes a spur line into the Mueller site and Northeast Austin — it’s plausible to speculate that the total system would possibly provide access to as many as 40 to 50% of city jobs. And, in addition, serve the huge ACC campus developing at Highland.
[…] • Guadalupe-Lamar urban rail line would serve 31% of all Austin jobs […]