Posts Tagged ‘austin roadways’

h1

Plans for Smart City could be dumb choice for Austin

31 January 2018

Austin’s “Smart City” vision is still mainly about cars and buses and roads. Graphic: Austin Tech Alliance.

Commentary by Roger Baker

Roger Baker is a longtime Austin transportation, energy, and urban issues researcher and community activist. The following commentary has been adapted and slightly edited from his comments recently posted by E-mail to multiple recipients.

Austin Transportation Dept. Director Robert Spillar has a vision of the city’s transportation future, and how high tech can solve Austin’s notorious transportation congestion, working along the lines of the Smart City Challenge Austin was trying to win last year. As a recent Governing article discloses, this Smart City vision is still mainly about cars and buses and roads and Austin becoming a “Smart City”, with driverless electric cars steadily displacing gas vehicles.

Another major component of Austin’s Smart City application will be put into place thanks to a voter-approved bond measure from November that included $482 million for up to nine “smart corridors” in the city. The improvements along those arterial roads will include a mix of old and new technology: turn lanes, bus bays and sidewalks will go in along with traffic and weather sensors and connected traffic lights.

The sensors will help traffic engineers better respond to changing conditions, as well help motorists and improve road networks. Texas universities, for instance, will use the information to improve traffic projections and troubleshoot the road network. The city has already done something similar using Bluetooth signals, which led officials to change a downtown street from one-way to two-way during major events to reduce traffic.

There are other components of the Smart City concept which may introduce other drawbacks. As local public transit advocate David Orr has pointed out, “one extremely problematic aspect of the auto-dependent Smart City craze is the proliferation of ride-hailing vehicles which increase congestion and VMT [vehicle miles traveled].”

So far as I know, the latest (2017) Austin city marching orders on transportation are publicized in its Smart Mobility Roadmap. The large PDF document gives the barest of mentions of the terms “light rail” on page 40 and “light rails” on page 71 of this 141 page document!!

The rest of this document is about how driverless electric cars and data collection everywhere are going to change our lives as part of the Smart City of the future – pure distilled essence of Robert Spillar, reading like science fiction, but expressed as certainty. Since Austin outranks Capital Metro in every political sense, the new Director at Metro had better get friendly with this new Austin-cratic transportation policy agenda. Since the Greater Austin Chamber of Commerce just hired two road transportation enthusiasts, Phil Wilson and Brian Cassidy, as top leaders, I imagine that things can only get worse.

A major financing notion being floated in connection with these Smart Mobility plans are PPPs, or Public-Private-Partnerships. But PPPs commonly depend on assuming decades of speculative municipal (or other governmental) bond indebtedness. In this category, the toll roads already built, using high-yield bonds being promoted by the Central Texas Regional Mobility Authority (CTRMA), and then unsuccessfully promoted on IH-35, would be some leading examples.

Now that the top legal architect behind the local CTRMA toll roads, Brian Cassidy, is working for the Greater Austin Chamber of Commerce, could he be convinced to shift his legal focus to transit? Maybe toward promoting PPP-financed rail on Guadalupe, and as the only way short of a much costlier subway to unclog this important corridor between UT and the Capitol?

Unfortunately, the Wall Street needs be sold on at least the possibility for good returns. Rocky Mountain Institute seems to have sold Rob Spillar on the startup potential for Smart Car technologies, which is the hook there. Uber is for occasional use or for tech guys with money, but of little interest for the average commuters that jam up our big roads at peak.

Whereas toll roads can be profitable, especially under conditions of rapid sprawl growth and while fuel is cheap, transit is almost never profitable. I think Capital Metro only gets about 8% return from the fare box (i.e., operating revenues cover only 8% of costs). Where does the profit to attract private investment then come from?

Why would anyone expect “unprofitable” light rail to attract PPP investment money? Any more than our totally “unprofitable” and poorly maintained sidewalks would do?

The strong increased driving trend that took off with the 2014 oil price collapse may be starting to weaken. Low-wage service workers don’t drive as much as they used to do unless they need to commute for work.

In my opinion, this nationally weakening driving trend, plus rising global fuel costs yet to come, are likely to create a swing in public sentiment, if not actual dollars, toward transit. A need when buses can no longer be scaled up adequately to do the job on Guadalupe, nor serve the suburbs adequately either. We have forgotten how to make hard but realistic choices, or come up with compassionate solutions.

The public needs to experience and see basic civic needs for libraries, sidewalks, and roads as being appropriate when applied to transit. Modest solutions scaled to solving current problems rather than big-bond-package urbanist visions should be the rule. I like the Strong Towns approach which basically says we need to concentrate on solving our current problems in a modest way, as opposed to grand and expensive bond debt lasting decades to deal with future hypothetical growth problems. See, for example, the following articles:

https://www.strongtowns.org/journal/2017/1/9/the-real-reason-your-city-has-no-money

https://www.strongtowns.org/journal/2016/6/14/greatest-hits-the-growth-ponzi-scheme

We could do wonders with a half-billion-dollar light rail line down the Lamar-Guadalupe corridor, but it may be some time until the stars line up right. That should have a much higher priority in a world that makes sense. As compared with TxDOT’s crazy obsession with widening I-35 in a futile battle against congestion – reality-denial which only delays doing the really smart stuff like running light rail past UT. ■

h1

Austin — National model for how roads are strangling transit development

31 October 2016
Central Texas Roadway System – brand-new highways (mostly tollways) under construction and planned. Map: CTRMA.

Central Texas Roadway System – brand-new highways (mostly tollways) under construction and planned. Map: CTRMA. (Click to enlarge.)

For decades, Road Warriors (aggressive proponents of roadway expansion) and other transit critics have disparaged America’s urban public transportation for its daily ridership levels amounting to just a small fraction of total metro area trips. In contrast, the vigorous ongoing expansion of urban roadway systems, outwardly sprawling development patterns, and levels of motor vehicle ownership has eclipsed transit development.

Of course, it’s widely recognized that much of the value of public transit resides in its function as a relief for the heavily congested passenger flows during daily peak hours and at other times, such as during special events – and this is where the high capacity of rail transit certainly excels. Nevertheless, it’s true that urban public transport needs to perform as much more than merely a subsidiary mode for peak traffic relief. Transit development has remained stunted in U.S. cities for decade after decade, well behind its role in comparable cities abroad, such as those in Europe, Asia, and Australia.

For Austin, “green” means “green camouflage”

Why is this? Public policy in Austin – a city that touts itself as embracing “green” principles and a commitment to public transport – illustrates how (despite decades of verbiage) the municipal and regional civic leadership and political establishment have maintained a commitment to prioritizing motor vehicle transport and roadway expansion.

From the Austin Tomorrow program of the 1970s to Envision Central Texas in the early 2000s to the more recent Imagine Austin community planning programs, community forums, official resolutions, and dozens of reports and pronouncements have solemnly affirmed a supposed dedication to more modern urbanist principles and public transport to provide the infrastructure for them. Yet time and time again, actual policy has funneled the heavy funding and other resources into further roadway development, and the continuation of suburban and rural sprawl development patterns.

The reality is: For Austin, “green” means green camouflage for major policies that are de facto harmful to the environment and quality of life. Austin actually serves as a model of how this commitment to prioritizing roads is strangling the development of adequate and fully effective public transport.

“Extravaganza” of roadway development

Ongoing roadway expansion doesn’t mean merely the addition of more lanes to existing highways. For the past half-century or more, it would be difficult to find a period in the Austin area when brand-new major highways have not been under construction.

This incessant extravaganza of roadway development includes: I-35 and then its double-decking; the “MoPac” (Loop 1) freeway; the development of the Ed Bluestein expressway; the conversion of Research Blvd. into a new freeway; the development of the Loop 360 expressway; the conversion of Ben White Blvd. into a new freeway; the development of the U.S. 290 East freeway. In more recent years, the construction of the SH 130 tollway; the 183-A tollway; the SH 45 tollway (north). And currently, the “MoPac” (Loop 1) reconstruction and tollway (HOT lanes) project; the 183 South (Bergstrom Expressway) tollway and expressway expansion project; the SH 45SW tollway; the SH 71 Express tollway project (between ABIA and SH 130); and the “MoPac” (Loop 1) South reconstruction and tollway (HOT lanes) project. And, of course, much more to come later – such as the mammoth overhaul of I-35 being planned by TxDOT. (See map at top of post.)

Meanwhile, over the entire lifetime of Capital Metropolitan Transportation Authority, since the agency’s inception in the mid-1980s, the one major capital investment transit project implemented has been MetroRail, currently operating a relatively tiny six-car system carrying less than 3,000 rider-trips a day. And in that same roughly 30-year period, the City of Austin and other local agencies have been siphoning off funds out of the transit agency’s basic revenue stream (generally ranging between 10-25%) to pay for roadway projects. For example, CMTA funding paid for most of the Build Greater Austin urban roadway program (over $93.4 million) and contributed heavily ($29.5 million) to the purchase of tollroad right-of-way for SH 45 and MoPac (Loop 1) into Williamson County north of Parmer Lane. (See Note at end of post.)

CAMPO boosts roads, dumps transit project

A powerful influence in the skewing of transportation policy toward road-focused priorities undoubtedly lies with the region’s major transportation planning body. Today, most large-scale transportation project funding decisions are made by CAMPO (Capital Area Metropolitan Planning Organization), now heavily biased in its structure toward suburban, exurban, and rural segments of the metro area.

In public comments to a Sep. 12th meeting of the agency, veteran transportation researcher and activist Roger Baker criticized CAMPO for being “heavily skewed to the suburban areas.” Another community activist, Jay Blazek Crossley, provided CAMPO board members with copies of a study he had completed highlighting disparities in democratic and demographic representation within CAMPO. As described in a report by Caleb Pritchard in the Sep. 15th Austin Monitor,

Crossley found that Travis County residents make up 57 percent of CAMPO’s six-county population. However, only 45 percent of TPB members come from Travis County communities.

More details of Crossley’s report can be found in the Streetsblog article «How Unrepresentative Is Your Regional Planning Agency?»

But in what almost was an act of chutzpah, at that same Sep. 12th meeting the CAMPO board voted to even further reduce Austin and Travis County representation in the strategic Technical Advisory Committee. Baker denounced the action as a “step backwards”.

While reorganizing itself to accelerate its programs for highway expansion and further regional sprawl development (see Roger Baker’s Feb. 2015 analysis), the CAMPO board moved to cancel its support for the region’s single new rail passenger project, Lone Star Rail (LSTAR). For approximately the past 15 years, this project had spent millions of dollars planning a regional rail passenger line to connect Round Rock, Austin, San Marcos, New Braunfels, and San Antonio with fast regional commuter-style trains.

The ultimate plan involved a swap with the Union Pacific Railroad (UP), which would sell its right-of-way and infrastructure to LSTAR in exchange for the agency providing new right-of-way and track along a route miles to the east. In addition to high-quality regional rail transit service, the plan would have eliminated the rail transport of hazardous cargo through the heart of center-city Austin.

But the plan was jeopardized when the UP reneged on its agreement in early 2016. Rather than stepping up to campaign for LSTAR and bring pressure on the UP to reinstate the deal, local officials – including those on CAMPO – did basically nothing, leaving LSTAR to hang by itself. In the end, even supposedly “progressive” liberal representatives from Austin and Travis County essentially sat on their hands, allowing the UP and CAMPO destruction of LSTAR to proceed without a fight. No champion, “progressive” or otherwise, stepped forward to tangibly defend the agency and this vital project. In the final CAMPO vote to withdraw support, there was not a single vote in opposition.

“Go Big” $720 million road bond measure

This background of a road-focused urban and regional mobility perspective is the context for the City of Austin’s “Go Big” campaign for a $720 million “Mobility Bond” package (to be financed by a hefty increase in local property taxes). This past summer, several “progressive” members of the City Council virtually led the charge to thwart efforts to add an urban rail starter line project to the package.

To sweeten the package in hopes of seducing some community support, the City added a smattering of funding for “alternative mobility” sidewalk and bicycle projects, and tried to portray the “Smart Corridors” road projects as somehow models of New Urbanism. The sweeteners worked – a number of community pro-pedestrian, cycling, neighborhood, and New Urbanist-aligned groups have jumped on board to support the bond campaign. (To her credit, liberal District 1 Councilmember Ora Houston has steadfastly opposed the bond package.)

But the basic thrust of the bond proposal has always been road expansion and improvements to facilitate motor vehicle traffic. From the outset, the program was sold as a way to “increase traffic throughput”. The ads for the bond package sponsored by Move Austin Forward (the primary campaign organization) focus on the benefits to cars, with slogans like “Cut Travel Time” and “Move Traffic Faster”.


TV ad promoting "Mobility Bond" package focuses on benefits for private motor vehicle traffic.  Graphic: Screenshot of Move Austin Forward TV ad.

TV ad promoting “Mobility Bond” package focuses on benefits for private motor vehicle traffic. Graphic: Screenshot of Move Austin Forward TV ad.


Noting recent news reports that the City hopes to procure federal matching grants to balloon the road bond funding into a massive $1.5 billion roadbuilding mega-program, Roger Baker commented

This makes it pretty clear that [Austin Mayor] Adler’s bond package is essentially top-down, business as usual road politics. This as opposed to a cost-effective engineering solution to some well-defined transportation problem or approach. Austin can’t possibly pave its way out of congestion by raising property taxes, and a truly smart city wouldn’t try.

This unceasing emphasis on unending roadway development continues to receive the overwhelming majority of funding. Especially on the local level, massive bond funding measures for roads such as the current $720 million “Mobility Bond” proposal have the effect of using up more and more of the available funding “oxygen” in the region and the city.

The Austin area’s continual expansion of roadways simultaneously fosters greater dependency on personal motor vehicles for local travel, and encourages more and more outwardly sprawling development patterns. These development patterns in turn necessitate increasing dependency on personal motor vehicle transportation. In a vicious spiral, taken together, more motor vehicles, greater dependency on them, and spreading sprawl further contribute to strangling the potential of public transport and opportunities to extend services and make them more effective.

Altogether, transit continues to be strangled, with no relief in sight. And if you wonder why transit ridership continues to be surpassed by traffic – despite mounting congestion – perhaps you can better understand a big part of the reason why.


Another TV ad screenshot promoting "Mobility Bond" package promises that bonds will "Move Traffic Faster".  Graphic: Screenshot of Move Austin Forward TV ad.

Another TV ad promoting “Mobility Bond” package promises that bonds will “Move Traffic Faster”. Graphic: Screenshot of Move Austin Forward TV ad.

NOTE: This article as originally posted stated that Capital Metro funds were used to purchase right-of-way for the SH 130 tollroad. However, ARN has not been able to verify this. Instead, evidence definitely indicates that Capital Metro funds were allocated to other tollroad projects, as indicated in the text.

h1

Baker: CAMPO’s 2040 plan = “prescription for intense and auto-addictive suburban sprawl development far into future”

16 February 2015
Suburban highways, freeways, and tollways like Loop 1 (MoPac) have driven suburban sprawl, forcing dependency on personal motor vehicles for nearly all local transportation. CAMPO's planning continues to be focused mainly on promoting suburban growth through further roadway expansion. Photo: CTRMA.

Suburban highways, freeways, and tollways like Loop 1 (MoPac) have driven suburban sprawl, forcing dependency on personal motor vehicles for nearly all local transportation. CAMPO’s planning continues to be focused mainly on promoting suburban growth through further roadway expansion. Photo: CTRMA.

By Roger Baker

Roger Baker is a longtime Austin transportation, energy, and urban issues researcher and community activist. The following commentary has been adapted and slightly edited from his comments recently posted by E-mail to multiple recipients.

On February 9th, CAMPO (the federally sanctioned Capital Area Metropolitan Planning Organization) held its monthly meeting, as usual to discuss regional planning policies. Although these tend to resemble (and to some extent overlap with) the City of Austin’s own planning issues, CAMPO’s anti-environmental, pro-sprawl policy governs state policy and the disposition of federal money, and thus tends to overrule Austin’s policies. So Austinites involved in local urban planning and transportation issues should take some interest.

Following is a link to the CAMPO agenda. I’d recommend reviewing Items 6A and 6B in particular, which discuss the new long-range 2040 CAMPO plan. When approved in May, this will lock-in regional funding and construction priorities policy for this new $32 billion 2040 plan:

http://www.campotexas.org/wp-content/uploads/2015/02/TPB-Agenda-February-9-2015.pdf

This CAMPO plan currently in the works, and nearing approval as our top regional infrastructure policy, seeks to double the Central Texas population to about 4 million, while putting most of the future population increase In Hays and Williamson Counties. This amounts to a prescription for intense and auto-addictive suburban sprawl development far into the future.

If you feed the projected sprawl-related commuter demand into CAMPO’s secretive travel demand model, you get nightmare-ish congestion throughout the region in 2040, as CAMPO has had to admit. I wrote about that here (my apologies for the misspelling of “congestion”):

http://changeaustin.org/2014/11/campos-congetion-nightmare/

This nightmare presents CAMPO with a political problem — trying to explain how it makes sense to spend $32 billion in fanciful future money only to see congestion get much worse than now, and what happens to congestion without this optimistic funding.

The CAMPO politics of planning policy assumes that the special interests tied to land development proceed as usual. The whole effort amounts to damage control. Congestion is treated like a dragon to be slayed mostly by roads, a process unconstrained by rational land use planning.

One response to CAMPO’s political problem of horrible modeled congestion is to use various behavior change assumptions to make future travel demand disappear, effectively by edict, by a united proclamation of the travel modelers and politicians.

The CAMPO planners have now managed to generate enough driver trip demand assumptions that they make more than 50% of the total Austin’s travel demand disappear as if by magic. This process is called Transportation Systems Management, which makes Austin’s future congestion picture, if still bad, look a lot better, despite CAMPO’s huge predicted level of sprawl development ringing Austin.

According to agenda Item 6A in the agenda linked above:

Staff is developing an analysis section similar to the analysis conducted by the Greater Austin Chamber of Commerce for their 2013 Mobility Report. This analysis will quantify the estimated congestion reduction benefit achieved by implementing 2040 Plan projects as well as additional travel demand management (telework, peak-shift and mode-shift) and transportation system management (operational improvements) strategies. Staff is also preparing a qualitative analysis of the CAMPO activity centers as a land use strategy.

And according to Item 6B:

PURPOSE AND EXECUTIVE SUMMARY

CAMPO staff and modeling consultants are developing a needs analysis for the draft CAMPO 2040 Plan which is similar to the analysis conducted by the Texas A&M Transportation Institute for the Greater Austin Chamber of Commerce 2013 Mobility Report. The analysis will quantify the estimated congestion reduction benefit achieved by implementing 2040 Plan projects as well as additional travel demand management (telework, peak-shift and mode-shift) and transportation system management (operational improvements) strategies. Staff and consultants developed assumptions regarding the implementation rates of the strategies so that the analysis will reflect reasonable results. Staff is requesting that the TAC review and provide input on the assumptions.

However, you won’t find this miracle of congestion reduction anticipation spelled out in CAMPO’s agenda. You would have to know just where to look. Here is where you can go to find the details:

http://www.campotexas.org/wp-content/uploads/2015/02/TAC-Presentation-January-2015.pdf

Scroll down to slide #29 where the future improvements contributing to future traffic flow are quantified in a tiny blurry side box as follows:


Assumed capacity impacts of Transportation System Management measures. Table: CAMPO Technical Advisory Committee.

Assumed capacity impacts of Transportation System Management measures. Table: CAMPO Technical Advisory Committee.


Grand total = 51.15% (assumed) total future trip demand reduction!

You can see these assumed policies/impacts also by going to the end of section 4B “Assumptions for Needs Analysis”, or scrolling down to page 55 of this other PDF file, and finding the list of policies in a box:

http://www.campotexas.org/wp-content/uploads/2015/01/TAC-Agenda-January-28-2015.pdf

Also see the same info at my Google link here:

https://drive.google.com/file/d/0B9kg5NdhKh8RSGhvVjg3aTBRb28/view

All this begs the question of why, assuming these congestion reduction policies can really work as claimed, CAMPO doesn’t put the highest policy priority on reducing our traffic demand 50% in these various ways immediately, instead of waiting any longer.

Are there really examples of this much telecommuting-led travel demand reduction on this scale, or this much voluntary peak travel time shifting? Are there local engineering reports to add credibility to the claimed travel reductions from the various suggested signal policies? How credible is CAMPO’s claim of over 50% demand reduction? If we do this stuff, will we still need rail that bad, or is it already assumed in the “Intermodal Transportation Projects” share of demand reduction?

Bottom line:

Business as usual. Sprawl land developers make no sacrifices, while taxpayers and drivers do all the heavy lifting and funding, and supposedly change their behavior enough to make more than half the projected travel demand go away.


Barton Creek Resort development near Loop 360. Lower-density suburban development, facilitated by publicly funded highway expansion, is virtually impossible to serve effectively and affordably by mass transit — and this leads to near-total dependency on personal motor vehicles for mobility. Photo: Mopacs, via Skyscraperpage.

Barton Creek Resort development near Loop 360. This kind of lower-density suburban development, facilitated by publicly funded highway expansion, and widespread throughout the Austin region, is virtually impossible to serve effectively and affordably by mass transit — and this leads to near-total dependency on personal motor vehicles for mobility. Photo: Mopacs, via Skyscraperpage.